Coal Mill Erection Manual
Erection Of Two Of The Biggest Coal Fired Hot Gas. Additionally one smaller 7 mw hgg for the drying process of coal mill was delivered and will be integrated into the loesche vertical mill. the hgg main bodies as well as the supporting steel structure, anticorrosion protection, painting, stairhouse and all required material for assembly on site were delivered in january 2014.